Rancang Bangun Prototipe Aplikasi Penjadwalan Perbaikan Kapal di CV. Bahtera Indah

Yosika, Herny Ernytria and Sholiq, Sholiq (2006) Rancang Bangun Prototipe Aplikasi Penjadwalan Perbaikan Kapal di CV. Bahtera Indah. In: Seminar Nasional Sistem & Teknologi Informasi (SNASTI) 2006, 26 Agustus 2006, Surabaya.

[img] Text
2006-V-96.pdf - Published Version

Download (754kB)

Search this title on : |

Abstract

The objective of scheduling minimize total time required for solving entire jobs and minimize mean time a job in the system. Factors that inluence in arranging ship reparation services schedule is: number variation, weight ship enlist, diference time initial time enlist, reparation time and dock time available. In this research analysis done to compare some methods application i.e. first come first serve, shortest processing time, and the longest processing time(LPT) with minimize makespan and mean flows time. Result test shows that LPT method is accurate method for CV Bahtera Indah because supporting company required is minimum makespan and mean flow time.


Export Record


Item Type: Conference or Workshop Item (Paper)
Additional Information: ISBN : 979-8968-29-8
Uncontrolled Keywords: Ship Repair Schedule, FCFS, SPT, LPT, Makespan, Mean Flow Time
Dewey Decimal Classification: 600 – Technology > 650 Management & auxiliary services
Divisions: Penelitian dan Pengabdian Masyarakat > Seminar Nasional Sistem & Teknologi Informasi (SNASTI) 2006
Depositing User: Agung P. W.
Date Deposited: 04 Jul 2014 14:33
Last Modified: 21 Nov 2018 13:24
URI: http://repository.dinamika.ac.id/id/eprint/356

Download Statistics

Downloads over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Actions (login required)

View Item   View Item